Power Shutdowns - June 2015


Location Jun 1 Jun 2 Jun 3 Jun 4 Jun 5
AE (a) (a) (a) - -
CCNI - 7am-7pm (b) 7am-7pm (b) - -
CII 5pm-2am (c) 5pm-7pm (d) 5pm-7pm (d) cancelled -
Lally (a) (a) (a) - -
MRC 5-7pm (e) 5pm-2am (c) 5pm-7pm (e) - -
Winslow building not affected

  • a) Feeder switching - No noticable impact, suggest shutdown of sensitive equipment
  • b) Sporadic emergency power outages
  • c) Normal power loss - shutdown required
  • d) Normal power loss - duration 5-60 minutes - shutdown suggested even with UPS
  • e) Normal power loss - duration 5-120 minutes - shutdown highly recommended even with UPS